HighVRAM has completed a five-page NVIDIA Hopper-to-Blackwell datacenter planning cluster: a cornerstone H100/H200/B200/B300 decision hub, a direct H100 versus B200 comparison, a standalone B200 180GB guide, a direct B200 versus B300 comparison, and the existing B300 capacity guide.
The useful distinction: B200 provides 180GB HBM3E per GPU. B300 is marketed in a 288GB tier, while NVIDIA’s Blackwell Ultra datasheet lists 270GB for an individual HGX B300 GPU. The cluster uses 270GB for conservative B300 model-fit planning and preserves the source context instead of treating every “288GB” label as interchangeable.
Where the capacity boundary moves
| Artifact | Files | B200 180GB | B300 270GB planning |
|---|---|---|---|
| Qwen3.5-122B BF16 | 250.173GB | Does not fit one device | Fits by files; 19.827GB nominal margin |
| Qwen3.5-397B GPTQ 4-bit | 235.708GB | Two-device arithmetic minimum | Fits one device; 34.292GB nominal margin |
| Qwen3.5-397B Q4 plus projector | 245.012GB | Two-device arithmetic minimum | Fits one device; 24.988GB nominal margin |
| Qwen3.5-397B BF16 | 806.796GB | Five-device arithmetic minimum | Three devices exceed files by only 3.204GB; plan four |
These are artifact-file calculations, not runtime-memory guarantees. CUDA context, cache, hybrid-attention state, temporary buffers, multimodal processing, batch and concurrency still require space. Several GPU memories also do not become one transparent pool: the runtime must support the intended placement and parallelism.
The Hopper-to-Blackwell step
The new H100-versus-B200 guide holds the platform comparison to SXM: 80GB HBM3 Hopper with compute capability 9.0 versus 180GB HBM3E Blackwell with compute capability 10.0. For Qwen3.5-122B, the listed 4-bit artifacts leave only 1.136GB or 2.554GB on an 80GB H100 before runtime allocation, while B200 leaves more than 100GB. B200 also turns the listed 122B FP8 and Q8 artifacts from two-H100 arithmetic requirements into one-device file fits. These are capacity results, not speed claims.
The platform decision is larger than capacity
- B200: Blackwell/GB100, 180GB HBM3E, up to 8TB/s, compute capability 10.0 and up to 1,000W configurable power.
- B300: Blackwell Ultra, 288GB product tier with 270GB/7.7TB/s in the individual-HGX datasheet, and up to 1,100W configurable power.
- Both: SXM-class datacenter accelerators that belong in qualified HGX/DGX systems, not desktop add-in cards.
Verify the complete server, memory exposed per accelerator, NVLink/NVSwitch topology, MIG partitioning, driver, CUDA, container, framework, kernels, power, cooling, support and measured workload before procurement.
Contribute evidence or follow the market
Operators can record the necessary fields with the local-AI benchmark builder. Readers watching availability can use the private browser watchlist and RSS feeds. The watchlist stays in the current browser and does not send price alerts.
A 180GB-versus-256GB cross-vendor decision
Compare NVIDIA B200 180GB with AMD MI325X 256GB when CUDA/Blackwell software readiness and the larger ROCm/gfx942 capacity tier are both viable. The guide exposes the one-device 397B 4-bit arithmetic boundary without turning peak specifications into an unsupported speed ranking.
Continue reading
- NVIDIA H100/H200/B200/B300 decision hub
- NVIDIA H100 vs B200
- NVIDIA H200 vs B200
- Qwen3.5 122B and 397B hardware paths
- Best GPUs and systems for local AI
Primary sources
- NVIDIA HGX H100/H200/B200 enterprise-reference components
- NVIDIA HGX AI Factory H200/B200/B300 comparison
- NVIDIA Blackwell Ultra datasheet
Published October 25, 2026. Fit does not establish compatibility, speed, reliability or value. Verify the exact supported system and reproduce the intended workload before purchase.